Contents
- 1 Is it expensive to remove concrete?
- 2 How much does it cost to remove old concrete slab?
- 3 How do I get rid of concrete in my yard?
- 4 How long does it take to remove concrete?
- 5 How do you dispose of old concrete?
- 6 How do you price a concrete job?
- 7 How much will my concrete driveway cost?
- 8 Can I lay grass on concrete?
- 9 How deep do you dig for a concrete patio?
- 10 How do you remove the top layer of concrete?
- 11 How often should you water new concrete?
- 12 How long should concrete set before removing forms?
- 13 What happens if it rains while pouring concrete?
Is it expensive to remove concrete?
On average, concrete removal costs roughly $2 – $6 per square foot, but this will vary depending on the complexity of the project, how easy the concrete is to access with equipment, where you live, and who you hire.
How much does it cost to remove old concrete slab?
If not reinforced, expect to pay between $300 and $500. If it is reinforced, expect to pay between $500 and $799,” said Kato of a 12-by-14 foot concrete slab that is approximately 4 inches thick. You can save up to $799 by removing the slab yourself with this step-by-step guide for concrete removal.
How do I get rid of concrete in my yard?
“Most concrete patios are un-reinforced, meaning that there is no rebar. So, in that case, a jackhammer is the best method to break the concrete into smaller pieces that can be shoveled away. If the area is very small, and the concrete is already cracked, a sledgehammer could also get the job done.”
How long does it take to remove concrete?
On average, it takes less than one day to remove a concrete patio. Of course, your exact project timeline will depend on a number of factors, just like the ones that affect your project’s cost. (The longer your project takes, generally the more expensive it will be.)
How do you dispose of old concrete?
Here are some ways to handle old concrete:
- Haul it to a construction and demolition waste facility.
- Give it to a local building supplies retailer.
- Advertise it for free or for sale online.
- Hire a professional junk hauling company.
- Offer it to companies that specialize in recycled materials.
How do you price a concrete job?
The cost of labor to pour concrete is $45 per hour. There can also be a delivery fee of $60. To have concrete poured and finished, it will cost $2.52 to $2.60 per square foot for the labor, and $2.83 to $3.57 per square foot for the concrete itself. Concrete slabs are poured either off or on the job site.
How much will my concrete driveway cost?
Most concrete driveway installation costs between $1,800 and $6,000 or $4 to $15 per square foot. The average is just above $3,000 or $6 per square foot. Factors like location, size, decorative elements, potential reinforcement and removing the existing surface can all influence that range.
Can I lay grass on concrete?
Can I lay turf on a concrete or asphalt drive? Grass turf won’t live for long on a solid surface. Not even if you water it. It’s great for a temporary lawn – perhaps for a special event but if you want a forever lawn, you will need to break up the hard surface and replace it with some good quality topsoil.
How deep do you dig for a concrete patio?
Dig 4 inches (about 10 cm) deep for raised and 8 inches (20.3 cm) deep for level.
- Compact the earth if necessary.
- If you‘re planning on having something extremely heavy such as a brick barbecue on your patio, your first step will be to pour a concrete foundation for added stability.
How do you remove the top layer of concrete?
The standard way to remove the top layer of concrete from concrete is via shot blasting. This might work for you. Obviously it depends on the relative hardness and shot resistance of the spilled concrete and the underlying brick. Since the concrete is presumably quite young, I think the brick wins.
How often should you water new concrete?
DO spray new concrete with water.
One of the most common methods for curing concrete is to hose it down frequently with water—five to 10 times per day, or as often as you can—for the first seven days. Known as “moist curing,” this allows the moisture in the concrete to evaporate slowly.
How long should concrete set before removing forms?
The forms or “molding” that holds the concrete in place until it dries should be left alone for at least two days to ensure that the concrete is completely dry. If the forms are removed too soon, the concrete can begin to sag, crack and collapse, especially if conditions like temperature affected its strength.
What happens if it rains while pouring concrete?
Pouring Concrete in Rain. Pouring concrete in the rain can compromise its strength, increasing the tendency for dusting and scaling to develop. Once the damage is done, it can be hard to rectify and will often ruin the appearance of the finished surface. Don’t let it rain on your parade.