How much does concrete pumping cost UK?

Concrete pump hire costs can vary but, as a guide, expect to pay around £300-£400 on top of the price of the concrete.

How do I become a concrete pumper?

The qualifications you need to become a concrete pump operator, also known as a concrete pumper, are a commercial driver’s license (CDL) and a basic understanding of mechanics. If you don’t already have a CDL, your employer may help you obtain one, so you able to drive a truck from one construction site to another.

How far can you pump concrete?

Ground line hydraulic pumps can shift concrete at 1m³ each minute and can extend to a distance of around 150 meters, in order to reach the pour site. This makes concrete pouring in awkward areas simple, as the pipes and hoses can go up, over and around obstacles.

How much does a line pump cost?

Our rates are as follows:

Concrete Pumping Rates
Line Pumps
Metres pumped $7 per cubic metre pumped + GST
Hourly rate $160 per hour (minimum of 4 hours per job site) + GST
Travel (one hour) $160 + GST

Is mixing your own concrete cheaper?

One of the least expensive ways to get concrete is to mix your own. You can buy bags of the mix from a home improvement store. Typically, you only have to add water for it to be ready to pour. Otherwise, you risk getting a weaker concrete once it cures, which could lead to cracks or crumbles within a couple of years.

You might be interested:  Quick Answer: How To Decorate Concrete?

How much does 1m3 of concrete cost?

The average cost of concrete is anywhere from $200 – $300 per m3 (cubic metre), though you could pay as much as $350 for 40 MPa strength. Variations in cost are due to local prices differing slightly, the type of concrete you order, and any additives or admixtures required.

What does a concrete pump operator do?

Concrete Pump Operators use pumps to pour ready-mix concrete on construction sites. Typical duties for this job include maintaining tools, driving trucks, assembling concrete pumps, and collaborating with other workers.

Is pumped concrete weaker?

It was believed for many years that a pump mix was weaker because it had to be batched with less large aggregate and more sand. We have learned over the years that a pump mix will be a better product because it will have a better gradation and maybe even a little more cement and the mixing will be better.

How long does it take for 4 inches of concrete to cure?

When waiting for concrete to dry, keep these timeframes in mind: 24 to 48 hours – after inital set, forms can be removed and people can walk on the surface. 7 days – after partial curing, traffic from vehicles and equipment is okay. 28 days – at this point, the concrete should be fully cured.

Will a cement truck crack my driveway?

Can You Drive Concrete Trucks and Heavy Equipment on Concrete Driveways? Unless the concrete contractor that built the concrete driveway designed it to withstand loads heavier that regular passenger vehicles, the answer is NO. Even if the concrete does not crack immediately, there will be issues down the road.

You might be interested:  Often asked: How To Clean Up Oil Stains On Concrete?

What is a concrete line pump?

A line pump (also known as a ground pump ) is a trailer-mounted concrete pump or a truck-mounted pump that uses a series of steel or rubber hoses to lead and place concrete wherever it needs to go. And a concrete truck will also unload the concrete into the pump’s hopper.