Often asked: How Do I Figure How Much Concrete I Need?

How much concrete do I need calculator?

How to calculate concrete:

  1. Determine how thick you want the concrete.
  2. Measure the length and width that you ‘d like to cover.
  3. Multiply the length by the width to determine square footage.
  4. Convert the thickness from inches to feet.
  5. Multiply the thickness in feet by the square footage to determine cubic feet.

What is the formula for calculating concrete?

Calculating the volume for concrete requires using three dimensions: length times width (which is area) times the height (thickness) or L x W x H. If you are using feet as your standard unit of measurement, this formula will give you the volume of concrete in cubic feet.

How many cubic yards of concrete do I need?

Multiply the width times the length times the height (W × L × H), or use our volume calculator to find the cubic feet. Convert the volume to cubic yards from cubic feet. To do so, divide the cubic footage by 27 to get the yards of concrete needed.

You might be interested:  How To Make Polished Concrete Floors?

How much quikrete do I need calculator?

Assume a 10-by-10-foot square area with concrete 4 inches thick. When you multiply 10 by 10 by. 333 feet, you get 33.333 cubic feet. Divide the total cubic feet needed by the total cubic feet that can be made from one bag of Quikrete Concrete Mix.

How many bags of concrete do I need for a 10×20 slab?

A 60-pound bag yields. 017 cubic yards, and an 80-pound bag yields. 022 cubic yards. For a 10 x 10 slab, you would need 77 60-pound bags or 60 80-pound bags.

How much concrete does it take to fill a hole?

Unless you are doing a monster hole it might be easiest to do this all in inches. If your hole is 36” deep and 10” wide, the calculation is 3.14 x 5 x 5 x 36 ÷ 1728. This gives you 1.6 cubic feet. If you forget the 1728 it is simply 12” x 12” x 12” or the number of cubic inches in a cubic foot.

How much does 2 yards of concrete cost?

According to the NRMCA – Ready Mixed Concrete Industry Data Survey, the average cost of concrete in 2018 was $120 per cubic yard, or $240 for the 2 cubic yards needed for a typical 10-by-10-foot patio. Bulk Concrete Prices.

Cubic Yards Price Range
1* $140-$200
2 * $280-$400
3* $420-$600
4* $560-$800

What is the correct mix for concrete?

In terms of the ratio for concrete, it depends on what strength you are trying to achieve, but as a general guide a standard concrete mix would be 1 part cement to 2 parts sand to 4 parts aggregates. For foundations, a mix of 1 part cement to 3 parts sand to 6 parts aggregates can be used.

You might be interested:  FAQ: Where To Buy Radonseal Concrete Sealer?

How many bags of cement do I need for 100 square feet?

4 bags ( 401 kg) of cement and 1593 nos bricks are required for 100 square feet 13.5 inch brick wall.

How many cubic feet is a bag of concrete?

One 60 -lb bag of concrete gives you. 45 cubic feet of concrete when mixed with 2.5 quarts of water. In order to have enough concrete for one cubic foot, you’ll require 2.2 bags of 60 -lb concrete.

How much is 4 yards of concrete cost?

Cost. Use $90 per cubic yard as a ballpark figure for concrete prices, but concrete slab cost will vary by region. Also, expect a fee of about $60 per load for delivery from a concrete truck for concrete cost. There could be other fees for such things as Saturday concrete truck delivery and small loads.

How much does a yard of concrete cover?

One Cubic Yard of Concrete: 4-inches thick – covers 81 square feet.

How much area does a 80lb bag of quikrete cover?

4 sq feet in that amount of cement.

Can you pour concrete directly on dirt?

Long story short, yes you can pour concrete over dirt.

How much quikrete Do I need to fill a 5 gallon bucket?

Your 5 gallon bucket is 0.7777850 cubic feet dry. You will need 2 – 50lb bags of Quikrete Fast Setting Concrete Mix to complete your project.

Leave a Reply